UPAC - Farnborough

Project Scope

Universal Piling engaged MAE Solutions to provide rope access labour support for a railway embankment stabilisation project in Farnborough. The 10-week project involved stabilising an embankment approximately 150m in length and 50m in height, which had recently failed. The scope of work included:

  • Low-level de-vegetation and stump reduction.
  • Installation of 770 Platypus anchors.
  • Placement of 4000m² of erosion protection mesh.

 

The project required meticulous planning and execution to ensure the railway network remained fully operational throughout the duration of the works.

MAE Solutions Approach

MAE Solutions partnered with Universal Piling to deliver this stabilisation project, utilising our expertise and resources:

  1. Specialist Labour Supply:
    MAE provided a team of experienced and qualified geotechnical and de-vegetation specialists to complement Universal Piling’s in-house rope access team.
  2. Supervision & Safety:
    IRATA Level 3 supervisors managed the project, ensuring all works adhered to stringent safety standards. This included selecting appropriate equipment and anchorage systems to guarantee a Safe System of Work (SSOW).
  3. Railway Operations:
    The work was carried out using our Personal Track Safety (PTS)-qualified technicians, allowing the railway to remain fully operational throughout the project.
  4. Slope Stabilisation:
    Our team efficiently installed 770 Platypus anchors and secured 4000m² of erosion protection mesh, stabilising the embankment and preventing further failure.

Key Deliverables

  • Safety & Efficiency: The project was delivered within the 10-week timeframe with a strong focus on safety and operational efficiency.
  • Continuous Railway Operations: The railway network remained fully operational throughout the stabilisation works.
  • Specialised Installation: Successfully installed 770 Platypus anchors and applied 4000m² of erosion prevention mesh.
  • Expert Collaboration: Seamless cooperation between MAE Solutions and Universal Piling ensured effective delivery of the project.

Outcome

MAE Solutions, in partnership with Universal Piling, successfully delivered a complex railway embankment stabilisation project safely, efficiently, and to the highest standards. Our tailored approach, combined with specialist expertise and PTS-qualified technicians, enabled the completion of this project without disruption to railway operations, demonstrating our commitment to delivering excellence in challenging environments.